6840 S. Tucson Blvd, Tucson, AZ 85756, U.S.A.
GET A CONSULTATION

CASE STUDY

McKinley Tower Seismic Retrofit, Anchorage, Alaska

A 14-story concrete tower damaged in the 1964 Good Friday earthquake sat vacant for some 20 years. QuakeWrap® carbon and glass FRP strengthened its shear walls, beams and columns without adding mass to the building.

  • PRODUCT: WET LAYUP CFRP AND GFRP
  • APPLICATION: SEISMIC RETROFIT
  • INDUSTRY: BUILDINGS
The 14-story McKinley Tower in Anchorage wrapped in scaffolding during its seismic retrofit
55,000 sq ft of carbon and glass FRP installed in 11 weeks
stories
14
columns wrapped
120
beams and walls retrofitted
400
to install the FRP
11 weeks

Project Details

OWNER
Marlow Development, Anchorage, Alaska
STRUCTURE
14-story reinforced concrete high-rise, built 1951 to 1952, 122 ft tall
QUAKEWRAP® SYSTEM
QuakeWrap® carbon and glass FRP fabrics, wet layup
STRUCTURAL ENGINEER
Schneider & Associates, Anchorage, Alaska
GENERAL CONTRACTOR
The Unit Company, Anchorage, Alaska
COMPLETED
September 2005
RECOGNITION
2006 Award of Excellence, International Concrete Repair Institute (ICRI)

PROJECT VIDEO

Strengthening the McKinley Tower Frames and Shear Walls

Plays from YouTube

01 · THE CHALLENGE

A Landmark Left Vacant After the 1964 Earthquake

The McKinley Tower survived the magnitude 9.2 Good Friday earthquake of 1964 but was badly damaged. With too little reinforcing steel, its beams, walls and coupling beams were heavily damaged: exterior spandrel beams failed in shear and the walls cracked diagonally. The building stood vacant for some 20 years.

A conventional retrofit with new concrete shear walls, enlarged columns and steel shapes was started, then stopped when costs ran too high. By then the new walls reached the 4th floor and much of the foundation work was done. The retrofit also could not significantly change the original exterior elevations, a condition of a grant awarded because the building is historic.

Reinforcing steel cages for new concrete walls inside the stripped McKinley Tower

02 · THE SOLUTION

Carbon and Glass FRP on the Inside Faces

In 2004 the owner and contractor hired Schneider & Associates to study other options, and QuakeWrap® FRP was selected as the cost-effective path. A 3D dynamic analysis found overstressed interior and exterior shear walls, so most of the work was on floors 5 to 14. All FRP went on the inside faces, so the exterior was not altered.

  • North and south bearing walls above the 4th floor converted to shear walls with biaxial carbon FRP up to the 9th floor, and unidirectional glass FRP from the 9th to the 10th
  • Boundary elements at the window corners of the east and west shear walls wrapped with unidirectional glass FRP and confined with 5/8-in. A307 through-bolts
  • Coupling beams and cantilever beams strengthened for shear with biaxial glass or carbon FRP, plus unidirectional carbon on top of the cantilevers
  • Every column wrapped with 24-in. unidirectional glass FRP tapes, at least two layers, for confinement
  • Roof slab strengthened for a water tank and heavy equipment with 6-in. carbon strips at 12 in. on center
Worker kneeling beside a concrete wall covered in black carbon FRP inside McKinley Tower

03 · THE RESULT

Reopened Without Adding Weight to the Building

Crews of 8 to 10 locally trained workers, trained and supervised by QuakeWrap, installed 55,000 sq ft of FRP in 11 weeks. The fabric added only an eighth of an inch to the walls and almost no mass, so seismic demand on the building stayed practically the same. That cut the soil anchors needed at the foundation from 88 to 40.

Because the City of Anchorage was new to FRP, an independent seismic consulting firm checked the plans and found the retrofitted building met all local seismic code requirements, and a local structural firm inspected the installation for the city. The project received the 2006 Award of Excellence from the International Concrete Repair Institute.

soil anchors
88 to 40
added to wall thickness
1/8 in.
McKinley Tower after the retrofit, with its exterior finished and painted
Crew working at a window opening in a concrete wall being strengthened with FRP at McKinley Tower

Have a Building That Needs a Seismic Retrofit?

Tell us about the structure, its condition and the loads it must meet. Our team will recommend the right QuakeWrap® system and provide specifications for your engineer.