CASE STUDY
Timber Bridge Pile Repair on the Araz Road Bridge
A timber bridge pile repair for the County of Imperial, California: 20 deteriorated timber piles in four bents were jacketed with glass FRP laminate and epoxy grout, and the four timber cap beams were wrapped with biaxial glass fabric, all in place under the bridge.

Project Details
- OWNER
- Imperial County Public Works (County of Imperial)
- PROJECT
- Emergency Repair of Araz Road and Bridges
- LOCATION
- Araz Road over Araz Wash, Imperial County, California
- STRUCTURE
- Timber bridge on 20 timber piles in four bents, with four timber cap beams
- PILE REPAIR
- Two-ply glass FRP laminate shell on 1 in. spacers, filled with epoxy grout
- CAP BEAM REPAIR
- Biaxial glass fabric saturated with high-strength epoxy
- REPAIR DETAILS AND TECHNICAL REVIEW
- QuakeWrap, Inc.
- FRP INSTALLER
- Composite Pros
- GENERAL CONTRACTOR
- Pyramid Construction & Aggregates
- CONSTRUCTION OVERSIGHT
- The Holt Group
- FIELD WORK
- April 13 to 24, 2026
01 · THE CHALLENGE
Deteriorated Piles and Cap Beams Under a County Bridge
The Araz Road Bridge carries Araz Road over Araz Wash in Imperial County, California. As part of the County of Imperial's Emergency Repair of Araz Road and Bridges project, the timber piles and cap beams that support the bridge needed rehabilitation.
The work covered 20 existing timber piles arranged in four bents. Decades of exposure, checking and localized deterioration had reduced the capacity of the piles and of the horizontal cap beams that carry the bridge above them. Some piles and caps were severely deteriorated.
Replacing these members would have been disruptive and expensive. The project team instead chose fiber-reinforced polymer (FRP) materials to strengthen and protect the existing timber.

02 · THE SOLUTION
Timber Bridge Pile Repair With a Glass FRP Shell and Epoxy Grout
Each timber pile jacket started with 1 in. spacers placed around the pile. Crews then wrapped high-strength glass FRP laminate around the pile, creating a permanent shell about 1 in. away from the original wood. Two layers of laminate were used, with the overlaps bonded with epoxy paste. Depending on field conditions, the jacket extended about 5 ft 6 in. to 6 ft 6 in. in height.
The space between the pile and the new shell was filled from the top with a specially formulated epoxy grout. Workers used a handheld concrete vibrator and hand tamping to consolidate the grout and eliminate voids. The result is a tightly fitted composite-and-grout system that works with the remaining timber and shields the repaired region from further exposure.
- Glass FRP laminate2 plies, overlaps bonded with epoxy paste
- Epoxy groutAbout 1 in. annulus, filled from the top
- Spacers1 in., set around the pile
- Existing timber pileHost

03 · THE RESULT
Cap Beams Wrapped and the Existing Timber Kept
After the piles were jacketed and grouted, crews turned to the timber cap beams. Damaged or irregular areas were filled with epoxy, and beam ends were rebuilt where needed. A noncorrosive biaxial glass fabric, saturated with high-strength epoxy, was then wrapped around each cap beam, with hand squeegees pressing the fabric against the timber to remove trapped air.
Construction logs show the pile and cap-beam rehabilitation ran from April 13 through April 24, 2026. Composite Pros performed the field work under general contractor Pyramid Construction & Aggregates, The Holt Group provided construction oversight, and QuakeWrap® provided the timber pile and cap-beam repair details and technical review.
When enough sound material remains, a deteriorated timber member does not always have to be removed and replaced. This repair preserved much of the existing structure, reduced the heavy construction needed beneath the bridge, and gave the piles and caps a corrosion-resistant exterior.

Products & Applications Used
-

PileMedic®
Laminate jackets for piles and columns, filled with grout or resin.
Explore PileMedic® -

Wet & Dry Layup FRP
Glass and carbon fabrics saturated with epoxy, the method used on the cap beams.
Explore Wet & Dry Layup FRP -

Bridge Piling
Concrete, steel and timber bridge piles repaired in place.
Explore Bridge Piling
MORE PROJECTS
Related Projects
-

Canadian Rail Timber Bridges
About 300 timber piles on remote rail bridges restored with PileMedic® shells and resin.
View case study -

Agricultural Port, Virginia
500+ timber piles restored with PileMedic® while the dock stayed open.
View case study -

Santee Cooper, South Carolina
Termite-damaged timber poles strengthened with PileMedic® on an energized line.
View case study
More on Timber Pile Repair
- GUIDE Timber Pile Repair: Methods and Test Results Posting, splicing, jackets and FRP shells compared
- Typical Details: Timber Piles PileMedic® laminate, spacers and grout annulus
- PileMedic® PLG14.13 Data Sheet Biaxial glass laminate properties
- Timber Rail Bridge Repair With FRP Ehsani and Herbert, SMSB 2026, Vancouver
Have Timber Bridge Piles That Need Repair?
Tell us about the bridge, the piles and the site. Our team will recommend the right QuakeWrap® system and provide specifications for your engineer.