CASE STUDY
500+ Timber Piles Restored While the Dock Stayed Open
At the largest agricultural port in the U.S., timber piles under a concrete dock had an average of 50% section loss, and some were completely detached. PileMedic® restored them to original axial and bending capacity while the dock remained open.

Project Details
- OWNER
- Perdue AgriBusiness
- LOCATION
- Chesapeake, Virginia
- STRUCTURE
- Concrete and timber dock on 500+ timber piles
- QUAKEWRAP® SYSTEM
- PileMedic® jackets, PileMedic® spacers, six #4 GFRP rebar, underwater cementitious grout
- INSTALLER
- FRP Construction, LLC
PROJECT VIDEO
Timber Pile Restoration Under a Concrete Dock
Plays from YouTube
01 · THE CHALLENGE
Deteriorated Piles Under a Working Dock
The dock's 12-in. timber piles had an average of 50% section loss, and some piles were completely detached. Piles under the concrete cap could not be replaced with new driven piles, and pile heights ranged from 15 to 30 ft.
The goal was to restore every pile to its original axial and bending capacity while the dock stayed open, working around ship traffic and seasonal shutdown requirements.

02 · THE SOLUTION
PileMedic® Jackets With a Fast Rebar Cage
The repair used the PileMedic® pile restoration system. Six #4 GFRP rebar were held in place with the PileMedic® spacer system for quick assembly, and underwater cementitious grout filled the 1.5-in. annulus between pile and jacket.
To simplify installation, a single design was developed that could be applied to many different pile conditions. Cross bracing was removed from the timber sections to allow wrapping, then reattached through the pile reinforcement.

03 · THE RESULT
Full Capacity, Lower Diving Costs
The confining pressure from PileMedic® greatly increased axial capacity, and the GFRP rebar in the grout annulus met the required bending capacity.
The time-saving rebar cage and pile wrap process significantly reduced diving labor, which made the repair economical for the owner.
- timber piles
- 500+
- GFRP rebar per pile
- 6 #4
- grout annulus
- 1.5 in.
- dock stayed in service
- Open
MORE PROJECTS
Related Projects
-

Port of West St. Mary, Louisiana
145 ft of steel sheet pile bulkhead protected with 42 SPiRe® panels.
View case study -

Port of Long Beach, California
Piles and pile caps of two cruise terminal dolphins repaired.
View case study -

Port of Galveston, Texas
30 corroded beams and 6 piles repaired with custom SPiRe® forms.
View case study
Have Piles That Need Repair?
Tell us about the piles and site conditions. Our team will recommend the right PileMedic® system and provide specifications for your engineer.