U.S. Coast Guard Tongue Point Steel Sheet Pile Bulkhead Repair
The U.S. Coast Guard selected the SPiRe® FRP panel system over traditional replacement as a long-term way to stop corrosion of a commercial-level steel sheet pile bulkhead at its Tongue Point facility in Astoria, Oregon.

Project Details
- CLIENT
- U.S. Coast Guard
- OWNER
- Tongue Point Facility
- LOCATION
- Astoria, Oregon
- STRUCTURE
- Steel sheet pile bulkhead, approximately 42 ft
- QUAKEWRAP® SYSTEM
- SPiRe® (Sheet Pile Repair) FRP panel system
- PANELS
- Flat, 1/4 in. thick FRP panels, 10 ft average height, shop cut as directed by the contractor
- FILL
- Underwater epoxy grout reinforced with glass FRP rebar
- FABRICATION
- QuakeWrap facility, Tucson, Arizona, shipped to Astoria
PROJECT VIDEO
Sheet Pile Wall Corrosion Protection With SPiRe®
Plays from YouTube
01 · THE CHALLENGE
A Corroding Bulkhead at a Working Coast Guard Base
The U.S. Coast Guard needed a long-term repair to prevent corrosion of a commercial-level steel sheet pile bulkhead at its Tongue Point facility in Astoria, Oregon.
The repair covered about 42 ft of bulkhead, with site conditions that varied along the wall. SPiRe® was compared with traditional replacement systems before it was selected.

02 · THE SOLUTION
Custom SPiRe® Panels Made in Tucson
SPiRe® was selected on overall project price, ease of installation, technical support from QuakeWrap and QuakeWrap's ability to customize the panels to the client's requirements.
Flat, 1/4 in. FRP panels were made at the QuakeWrap facility in Tucson, Arizona, shop cut to the lengths the contractor needed for the varying site conditions, and shipped to Astoria. They were anchored in front of the corroded sheet piles and filled with underwater epoxy grout reinforced with glass FRP rebar.
- Custom-length SPiRe® panels coordinated with the contractor
- Stainless steel anchors, washers and nuts with loose spacers for field installation
- QuakeBond™ epoxy for sealed panel overlaps
- QuakeBond™ epoxy grout for the annular space
- Installation, operations and maintenance manuals

03 · THE RESULT
Still Performing Nearly 8 Years Later
About 420 sq ft of SPiRe® panels now face the bulkhead. At the customer's request, a black epoxy was applied over the panels when the repair was complete. QuakeWrap's project video notes the panels were installed with minimal interruption and without cofferdams.
A photo of the bulkhead taken nearly 8 years after the repairs were completed shows the system still performing well.
- panels installed
- 420 sq ft
- later, still performing
- ~8 years

Products & Applications Used
MORE PROJECTS
Related Projects
-

Port of West St. Mary, Louisiana
145 ft of steel sheet pile bulkhead protected with 42 SPiRe® panels.
View case study -

Port of Galveston, Texas
30 corroded beams and 6 piles repaired with custom SPiRe® forms.
View case study -

Port of Long Beach, California
Piles and pile caps of two cruise terminal dolphins repaired.
View case study
Project Documents and Resources
Have a Seawall or Bulkhead That Needs Repair?
Tell us about the wall and site conditions. Our team will recommend the right QuakeWrap® system and provide specifications for your engineer.