36-in. Wastewater Process Piping External Rehabilitation

A fully structural carbon FRP system from QuakeWrap®, rated for 65 psi operating pressure and applied to the outside of a steel process pipe for Cobb County Water System, Georgia.

  • PRODUCT: WET LAYUP CFRP
  • APPLICATION: PIPE REPAIR
  • INDUSTRY: WATER & WASTEWATER
Cobb County 36-in. steel process pipe loop after the carbon FRP wrap and gray UV-resistant top coat
65 psi operating pressure the FRP system was designed for
pipe diameter
36 in.
retrofitted
54 ft
operating pressure
65 psi
expected service life
50+ yrs

Project Details

OWNER
Cobb County Water System
LOCATION
Cobb County, Georgia
STRUCTURE
36-in. steel process pipe, 54 ft
DESIGN PRESSURE
65 psi operating
QUAKEWRAP® SYSTEM
Carbon + glass FRP, external wet layup (QW U27C, QW B2610G)
FRP SYSTEM AND MATERIALS
QuakeWrap, Inc.
FRP INSTALLER
FRP Construction

01 · THE CHALLENGE

Strengthen a Pressurized Steel Pipe From the Outside

Cobb County Water System needed to retrofit 54 ft of 36-in. diameter steel process piping at its water treatment plant.

The retrofit had to withstand an operating pressure of 65 psi.

Photo needed: the 36-in. pipe before repair. None is in the project profile PDF (its collage starts with carbon layers on), on pipemedic.com/case-study/ or in the quakewrap.com and pipemedic.com media libraries. QuakeWrap or FRP Construction to supply.

02 · THE SOLUTION

A Fully Structural Carbon FRP System

A design-build team was selected. QuakeWrap® provided the FRP system and materials, and FRP Construction installed it using the external wet layup method.

The pipe surface was prepared by abrasive wire wheeling, then blown and wiped clean. A dual-layer glass fabric laminate went on first to make the system impermeable, form a dielectric barrier between the steel and the carbon, and add strength in the hoop and longitudinal directions. Carbon FRP layers then carry the 65 psi pressure.

  1. UV top coat20 mil
  2. Epoxy top coat40 mil
  3. Carbon FRP (QW U27C)2 layers
  4. Glass FRP (QW B2610G)Dielectric barrier
  5. Epoxy tack coatHigh-adhesion bond
  6. 36-in. steel pipeHost
Eight photos of the Cobb County 36-in. pipe as carbon FRP layers go on, then the finished gray top coat

03 · THE RESULT

Built for More Than 50 Years of Service

FRP Construction completed the installation successfully. The expected service life of the FRP system is more than 50 years, with the UV-resistant top coat possibly replenished after an extended time in service.

pipe diameter
36 in.
retrofitted
54 ft
design pressure
65 psi
expected service life
50+ yrs
Two installers in white suits applying FRP to the crown of a large concrete storm tunnel in Minneapolis

Have a Pipe That Needs Repair?

Tell us about the pipe, its pressure and condition. Our team will recommend the right QuakeWrap® system and provide specifications for your engineer.