CASE STUDY
96-in. PCCP Circulation Water Piping Rehabilitation at Apache Generating Station
Three 20 ft sections of 96-in. prestressed concrete cylinder pipe flagged by electromagnetic inspection were lined with a fully structural carbon FRP system from QuakeWrap®, following AWWA C305.

Project Details
- OWNER
- Arizona G&T Cooperatives, Inc., Apache Generating Station
- LOCATION
- Cochise, Arizona
- STRUCTURE
- 96-in. prestressed concrete cylinder pipe (PCCP) circulation water piping, three 20 ft sections
- STANDARD
- AWWA C305
- LOADS
- External soil pressure and 82 psi internal (hydrostatic) pressure
- QUAKEWRAP® SYSTEM
- Fully structural carbon FRP liner, internal wet layup (QW U27C and B41C carbon, QW B2610G glass at the end terminations)
- FRP SYSTEM AND MATERIALS
- QuakeWrap, Inc.
- FRP INSTALLER
- FRP Construction
01 · THE CHALLENGE
Three PCCP Segments in Immediate Need of Repair
Arizona G&T inspected the large-diameter PCCP circulation water piping at its Apache Generating Station with electromagnetic technology. Three segments were identified as in immediate need of structural repair.
The owner wanted the repair done with as little downtime as possible.

02 · THE SOLUTION
A Fully Structural Carbon FRP Liner to AWWA C305
QuakeWrap® recommended a fully structural carbon FRP liner for three 20 ft sections of the 96-in. pipe, provided specifications and design support, and supplied the materials. Following AWWA C305, the system can carry external soil pressure and 82 psi of internal hydrostatic pressure.
FRP Construction installed the liner by wet layup: a high-adhesion epoxy tack coat, seven layers of carbon fabric with extra tack coat along the seams, and a 20 mil epoxy top coat.
- Epoxy top coat20 mil
- Carbon FRP (QW U27C and B41C)7 layers
- Epoxy tack coatHigh-adhesion bond
- 96-in. PCCPHost pipe

03 · THE RESULT
Lined and Sealed in Less Than Two Weeks
At each end of the liner, QuakeWrap® dual glass fabric (B2610G) and an EPDM compression seal were placed over the glass and carbon layers, following the AWWA C305 end termination detail.
FRP Construction completed the installation successfully in less than two weeks, meeting the owner's goal of minimal downtime.
- sections lined
- 3 x 20 ft
- installation
- < 2 weeks

Products & Applications Used
-

Internal Pipe Lining
Carbon or glass fabric bonded inside the pipe by hand or with a packer.
Explore Internal Pipe Lining -

Wet & Dry Layup FRP
Carbon and glass fabric systems for beams, columns, slabs, walls and pipes.
Explore Wet & Dry Layup FRP -

Pipe Repair
How QuakeWrap® products repair water, sewer and industrial pipes.
Explore Pipe Repair
MORE PROJECTS
Related Projects
-

Cobb County, Georgia
54 ft of 36-in. steel process pipe wrapped with carbon FRP for 65 psi.
View case study -

Lake Lure Dam, North Carolina
Century-old riveted steel penstock with up to 80% wall loss, lined in two weeks.
View case study -

Salt Lake City, Utah
A 48-in. culvert rehabilitated from the inside with internal wet layup.
View case study
Have a Pipe That Needs Repair?
Tell us about the pipe, its pressure and condition. Our team will recommend the right QuakeWrap® system and provide specifications for your engineer.